Construction cost calculator

Free construction cost calculator using Turkey’s 2026 official building unit costs (OG 03.02.2026/33157) × gross m². Land and VAT excluded by default.

2026-11-10 — Unit costs match the Official Gazette tebliğ TL/m² values exactly. Do not confuse with projected or incorrect third-party tables.

Prepared by Espada Scaffolding technical content team. Official figures follow the Ministry notice; verify on site.

Housing shortcuts

Project

Default is the tebliğ value. Editing uses your own TRY/m² and turns TÜİK off.

Espada products for shell formwork

Open prop, table, facade and connection products — or request a quote.

How is the official approximate building cost calculated?

Early feasibility usually multiplies gross floor area by a building-class unit cost. In Turkey the official reference is the Ministry’s annual Yapı Yaklaşık Birim Maliyetleri notice. It supports architectural/engineering fee and supervision bases — it is not a turnkey contractor quote.

Steps

  1. Pick a building class (housing shortcuts or full list).

  2. Enter total gross floor area (m²).

  3. Optionally edit the unit cost or enable the TÜİK adjustment.

  4. Optionally enable VAT, supervision fee or extras.

  5. Read approximate building cost, effective m² and share breakdown.

How it is calculated

Multiply the gross floor area (m²) by the unit cost (TRY/m²) for the selected building class; that product is the approximate building cost. You can optionally add the building-supervision fee under Law 4708 article 5: 1.75%, 1.50% or 1.25% of that amount by area band (up to 1,000 m², 1,001–50,000 m², and above 50,000 m²). The grand total is the building cost plus any extras you opened and VAT if you checked that box.

What is the tebliğ for?

It sets a common official base for professional fees and related statutory calculations. Market build cost still depends on materials, labour, region and quality.

2026 housing / villa unit costs

Most searched housing classes. VAT excluded; 15% overhead and 10% contractor profit included.

ClassScope2026 TRY/m²
III-AApartment housing up to 3 storeys19,800
III-BHousing under 21.50 m; detached/duplex under 200 m²21,050
III-C21.50–30.50 m housing; detached/duplex 200–500 m²23,400
IV-A30.50–51.50 m housing; higher-spec / villa band26,450
IV-BHousing over 51.50 m; detached/duplex 500 m²+33,900

100 / 150 / 200 m² examples

Using III-B (21,050 TRY/m²). Land, permits and VAT excluded.

  • 100 m²

    2,105,000 ₺

    Incl. 20% VAT: 2,526,000 ₺

  • 150 m²

    3,157,500 ₺

    Incl. 20% VAT: 3,789,000 ₺

  • 200 m²

    4,210,000 ₺

    Incl. 20% VAT: 5,052,000 ₺

2025 → 2026 unit cost change

Yearly change for housing classes.

Class20252026Change
III-A17,10019,800+15.8%
III-B18,20021,050+15.7%
III-C19,15023,400+22.2%
IV-A21,50026,450+23.0%
IV-B27,50033,900+23.3%

2026 building unit costs — full list

OG 03.02.2026/33157. Typical building examples summarised from the notice.

ClassTRY/m²Typical buildings
I-A2.600Simple farm buildings, gazebos, garden walls, plastic greenhouses
I-B3.900Pens, rigid greenhouses, ancillary buildings
I-C4.200Water tanks, barns, EV chargers, retaining walls
I-D4.800Solar plants (GES)
II-A8.100Marine piers, general warehouses, agro-industry
II-B12.500Hangars, covered markets, sports pitches
II-C15.100Rural houses (<200 m²), bungalows, light industry
III-A19.800Apartments up to 3 storeys, nurseries, parking
III-B21.050Housing under 21.50 m, detached <200 m², primary schools
III-C23.40021.50–30.50 m housing, detached 200–500 m², dorms
IV-A26.45030.50–51.50 m housing, small malls, 1–2★ hotels
IV-B33.900Housing over 51.50 m, detached 500 m²+, banks
IV-C40.500Large malls, 3★ hotels, smaller hospitals
V-A42.350Campuses, stadiums, mixed-use complexes
V-B43.8504★ hotels, 200–400 bed hospitals
V-C48.750Opera/museums, 400+ bed hospitals, congress
V-D53.5005★ hotels, city hospitals, airport terminals
V-E103.500Wind plants (RES)

How is the supervision fee calculated?

Law 4708 art.5: fee is a percentage of the approximate cost from the tebliğ.

Floor areaRate
Up to 1,000 m²1.75%
1,001 – 50,000 m²1.50%
Over 50,000 m²1.25%

Shell, finishes and turnkey

The tebliğ assumes average materials; it is not a ‘turnkey all-in’ market price. Shell vs finishes vs MEP shares vary by project. The calculator breakdown is illustrative only.

Why turnkey house-build cost is different

Many people searching for house-build or turnkey construction cost expect a market contractor price. This tool calculates the official approximate building unit cost. Those two intents must stay separate.

Official approximate cost vs turnkey market cost

The official notice is a common base for professional fees and supervision bases. Turnkey is a contractor’s market price for an agreed scope: materials, labour, ground conditions, site logistics and finish standard drive the number. A tebliğ TRY/m² figure is therefore not a turnkey TRY/m² quote.

What usually drives turnkey cost

  • Scope: shell only, finishes included, furniture/landscape or not
  • Ground/foundation conditions and special works
  • Material and labour quality band
  • Off-site utilities, permits and site overheads
  • Programme, financing and contingency

Why city/region is not a fixed multiplier here

Labour, logistics, local supply and municipal processes vary by place. A single city factor does not represent every project, so this tool does not apply a fixed regional coefficient. Regional differences belong in survey and quoting.

What this calculator includes and excludes

By default the tool returns only the tebliğ building cost (area × unit cost). Supervision fee, VAT, land, permit fees, excavation/landscape and contingency are added only when you enable them. It does not invent turnkey market averages or city prices.

Included

  • Approximate building construction cost
  • 15% overhead
  • 10% contractor profit

Excluded

  • Land cost
  • Landscaping
  • Off-site utilities
  • VAT (optional in the tool)
  • Permit fees and financing

Frequently asked questions

What is the 2026 housing cost per m²?

III-A 19,800; III-B 21,050; III-C 23,400; IV-A 26,450; IV-B 33,900 TRY/m² ex-VAT. Land excluded.

How much is 100 m²?

With III-B: 100 × 21,050 = 2,105,000 ₺ ex-VAT; about 2,526,000 ₺ with 20% VAT. That is also the tool’s default tebliğ total before optional extras.

Is land included?

No. The tebliğ covers building cost only.

Is this a turnkey quote?

No. It is an official reference, not a contractor offer. Turnkey market cost is explained in a separate section below.

Is VAT included?

Tebliğ values exclude VAT. Tick the VAT box to add 20%. Reduced housing rates depend on conditions.

How do I pick a class?

Use the typical-building list. Housing class follows height and detached area thresholds.

What is shell cost?

Usually concrete, rebar, formwork and walls. The tool’s shell share is illustrative.

Which class for villas?

Detached/duplex bands: III-B (<200 m²), III-C (200–500), IV-B (500+).

What is the TÜİK toggle?

The tebliğ is fixed in Jan 2026; the index moves monthly. The factor is a documented snapshot, not a quote.

How is supervision fee set?

Approx. cost × 1.75% / 1.5% / 1.25% by area band (Law 4708).

Why do other sites show different numbers?

Some publish projections or wrong tables. Espada uses OG 03.02.2026/33157 exactly.

Where is formwork/scaffold cost?

Inside the m² average — for take-off use prop/table/facade calculators or /rental.